SPC crude oil production during the last year 2011 hits / 61505689/ in schedule of 87%        Syrian Petroleum Company produced / 1086598 / thousand cubic meters of assosiated gas in schedule of 93%.        Syrian Petroleum Company produced / 3509971/ thousand cubic meters of free gas in schedule of 102%.        Syrian Petroleum Company drilled / 195647/ meters schedule 122% .       


Damascus Local:





Available External Tenders



File noSubject Issue dateClose dateTender/bookTech/spec
202/2011Bottom Hole Drilling tools08/12/201112/02/2012
201/2011 Subsurface Sucker Rod Pump13/12/201108/02/2012
204/2011Well Head Assembly18/12/201112/02/2012
209/2011Coiled tubing Unit And Nitrogen Pumping Unit With Accessories Special For Oil Field Works18/12/201112/02/2012
205/2011KCL Used For Oil Wells22/12/201113/02/2012
206/2011S/P For 840SE Drawworks EPL-94730/12/201115/02/2012
207/2011Allison Transmission30/12/201119/02/2012
215/2011Slips30/12/201126/02/2012
216/2011Welding Electrodes30/12/201126/02/2012
150/2011/AS/P For Gas Turbine Single Shaft Frame 5 MS 5001 Type02/01/201228/02/2012
166/2011Carboxu Methyl Cellulose CMC-LV (600) Tons 02/01/201212/02/2012
196/2011Electrical Spare Parts For DER 600 Drilling rig Ural Mash Operation (Joystick)02/01/201229/02/2012
208/2011Casing and Well Head Tools03/01/201227/02/2012
210/2011Steel Wire Ropes03/01/201213/02/2012
211/2011Drilling Line03/01/201219/02/2012
214/2011Integral Primary Foam Seal Secondary Seal And Flexible Hose Roof Drain Systems03/01/201222/02/2012
218/2011Oil Filled Distribution Power Transformers 20/0.4 KV03/01/201227/02/2012
219/2011Greases For Drill Collars, Drill pipe Tool Joint And Casing03/01/201229/02/2012
191/2011For Treatment Of Oil Sludge And Seiments Existing In Oil Pits Of Jbesseh Oil Fields10/01/201213/02/2012
217/2011S/P For Pick Up Mitsubishi10/01/201226/02/2012
72/2010/DS/P For HT-400 Pumps23/01/201219/03/2012
190/2011Down Hole Equipments Deep Well Completion08/12/201101/02/2012
192/2011Pressure Vessels08/12/201105/02/2012
193/2011S/P For IRI (IDECO)- Work Over Rigs08/12/201105/02/2012
194/2011Air Operated Double diaphragm Pumps08/12/201106/02/2012
197/2011S/P For National Oilwell Rigs 15000FT08/12/201107/02/2012
199/2011Packing Ring for Stuffing box Of Beam Pumping System08/12/201108/02/2012
200/2011Sucker Rod08/12/201107/02/2012


NOTE

Syrian petroleum Company will not under any circumstances accept any liability for the accuracy of the details provided above nor for any event arising from the use or interpretation of the information.



Amendment Advertisments

vbnbn 158-2011 dated 14.12.2011 (amendment of closing date)
vbnbn 188-2011 dated 10.1.2012 (amendment of closing date)